There is ongoing work at the physiotherapy
Life Award 2013 March 2014 The toilet for the store is almost completed. Tiling and plumbing works completed with toilet seat, shower, wash hand basin and urinal fixed. Door fixed – left with lock to be mounted and the exterior and entrance to the door to be plastered. There is ongoing work at the physiotherapy […]